MINUTES OF OFFICIAL PROCEEDINGS
SPECIAL
MEETING – JANUARY 4, 2022 – 5:30 P.M. – CLASSROOM “A” – CORSICA-STICKNEY HIGH SCHOOL
A
Special Meeting of the Corsica-Stickney Board of Education was held on Tuesday,
January 4, 2022 – 5:30 p.m. in Classroom “A” of Corsica-Stickney High School.
Members
Present: Jeremy Wright, President; Chad Clites, Roxann Gerlach, Micheal
Plooster, Darci Neugebauer, & Shannon Tolsma
Members
Absent: Jennifer Van Gorp
Officers
Present: Scott Muckey, Superintendent;
and Angie Feenstra, Business Manager.
Guests:
Paul Williams and Jim Weber, Puetz.
President
Wright called the meeting to order at 5:31 p.m. and a quorum was established.
Motion
by Tolsma second by Plooster to approve the agenda as presented. All members
voted AYE. Motion carried.
There
were no potential conflicts of interest.
Paul
Williams and Jim Weber with Puetz, Inc. who was hired as the Construction
Manager at Risk for the Corsica & Stickney projects met with the board to
give them the results of recent bid opening for the Stickney site project.
After the bids came in higher than estimated the board had asked them to go
back and find areas of cost savings so the bids could come within budget. They
were able to do some value engineering and make some changes to the designs
that would lessen the final bill. After some discussion on what options to
accept and which ones to leave the following motions were made.
Motion
by Clites second by Tolsma to remove the shop addition from the Corsica site
project. This would reduce the project by approximately $220,000.00. All
members voted AYE. Motion carried.
Motion
by Gerlach second by Plooster to accept the following bids with the value
engineering deductions in place: Bid Package #1: General Construction—Puetz
Design+Build--$330,470.00; Bid Package #2: Earthwork—Schoenfelder
--$328,105.00; Bid Package #3: Concrete—Rexwinkel Concrete--$267,165.00; Bid
package #4: Masonry—S&S Masonry-- $445,143.00; Bid package #5: Metals
(Materials only) – Puetz Design+Build -- $355,350.00; Bid Package #6: Metals
(Erection only) – Puetz Design+Build -- $185,442.00; Bid Package #7: Roofing/Metal
Panels/Flashing – MJ Dalsin -- $295,455.00; Bid Package #8: Joint Sealants
& Fire Stopping – Jones Caulking -- $47,660.00; Bid Package #9: Aluminum
Doors/Windows/Glazing – Interstate Glass -- $69,154.00; Bid Package # 10:
Gypsum Wall Systems – Sands -- $382,829.00; Bid Package #11: Acoustical
Panels/Ceilings – F.M. Acoustical -- $24,580.39; Bid Package #12: Floor
Coverings – CID -- $66,252.00; Bid Package #13: Fluid-Applied Flooring –
Rexwinkel Concrete -- $11,200.00; Bid Package #14: Painting – Del Schuhs
Painting -- $54,102.00; Bid Package #15: Plumbing – Krohmer Plumbing --
$434,532.00; Bid Package #16: HVAC – Baete -- $354,094.00; Bid Package #17:
Electrical – Electric Construction -- $320,052.00. All members voted AYE.
Motion carried.
There
being no further business, at 6:25 p.m., motion by Tolsma second by Plooster to
adjourn. All members voted AYE. Motion carried. The next regular meeting date
will be on Monday, January 10, 2022 at 7:30 p.m. in the study hall room of the
Corsica-Stickney Elementary School.
ATTEST:
JEREMY WRIGHT – PRESIDENT OF THE BOARD OF EDUCATION
ANGELA FEENSTRA- BUSINESS MANAGER